Gas
Gas receiving station - Thisvi combined cycle power plant

Gas receiving station - Thisvi combined cycle power plant

Design, Supply, Manufacturing and Commissioning of Gas Stations in respect with customers’ needs for the delivery of gas in appropriate conditions (filtration degree, pressure, temperature, flow capacity) to the consumers. Metron can design and produce stations for HP/MP/LP pressure ranges and various gas receiving conditions (sweat or sour gas, low temperature, high water/HC condensates)

Scope

Engineering, procurement of mechanical, electrical and instrumentation equipment, their assembly on rigid steel frames ready for on site installation, anchoring material, external painting/coating, testing/fat and packing/ crating. Moreover, transportation, on site erection activities, system commissioning, supervising system alignment to plant DCS performance test runs and a hazop study of the supplied system

TECHNICAL DATA

Region-Country:
Europe, Greece
Location:
Thisvi
Project:
Gas receiving station - Thisvi combined cycle power plant
Client:
EDISON - ΑΚΤOR CJV
Design:
Pressure: 70barg, Capacity: 80,400 m3/h
Size:
10’’ - ANSI600
Date:
2012